Production of a mixed-in-place wall for Hirslanden Klinik

Vibration-free. Precise. Sustainable

Our experts from Bauer Spezialtiefbau Schweiz replaced the planned sheet pile wall with a mixed-in-place wall (MIP) for the extension of the Hirslanden Klinik Aarau. The 550 mm thick wall extends to a depth of 17 m and contains HEB and double UPE beams. Two areas were secured with 2 m wide jetting columns. Due to environmental regulations, part of the MIP wall will be removed again in 2025 using the Kelly drilling method. The work started in January 2024 and was completed on schedule in February. The RTG RG 27 S and RG 19 T were used for beam installation and splash protection.

Facts about the project
Company :

BAUER Spezialtiefbau Schweiz AG

Location :

Aarau, Switzerland

Project name :

Hirslanden Klinik Aarau

Period :

January 2024 to summer 2025

Services :

Mixed-in-place wall, Jetting, Replacement drilling

Smart excavation support for Hirslanden Clinic

Are you starting a project?

Get in touch with us.

BAUER Spezialtiefbau Schweiz AG

Im Langacker 20a
CH-5405 Baden-Dättwil