Foundation work for new construction of a large bridge
Constructing the 11.5 km west bypass in Rosenheim: For this project, Bauer Spezialtiefbau was tasked with foundation work for the new construction of a large bridge over a railway line. No easy task, since the execution of the mixed foundation was very elaborate: In total, roughly 11,500 m² of pressed sheet pile wall, 15,000 m of vertical drains and 253 large-diameter bored piles were constructed up to a depth of 50 m. The particular challenge: the unique construction soil on site. Starting from a depth of roughly 2 m to 5 m is a soil known as Rosenheim marine clay. This was an extremely sensitive soil stratum which offered a very low load-bearing capacity and high water content. A large project with many challenges.
BAUER Spezialtiefbau GmbH
Rosenheim, Germany
West bypass, Rosenheim
Menard GmbH
February 2019 to May 2020
Foundation work (mixed foundation), pressed sheet pile wall, vertical drains, large-diameter bored piles
Bridge foundation in Rosenheim marine clay
Are you starting a project?
Then get in touch with us.