Establishment of the world’s largest monopile production facility
All signs point to the future: On a former steel plant in Teesside, a new production site is under construction. What makes this project unique: The future production site in the northeast of England extends across a 90 hectare site and will be the first XXXL monopile factory for offshore wind turbines after its completion. Up to 150 monopiles will be produced here every year. For this project, our experts installed roughly 7,000 piles, including bored piles and CFA piles, up to a depth of around 35 m. That’s no easy task, and there were many challenges involved. All in all, this was a tough job – and in record time of just 14 months. But that’s no problem for a leading specialist foundation engineering company like us.
BAUER Technologies Ltd.
Teesside, UK
Teesside Freeport, Monopile Factory Piling
Keller UK
Since June 2022
Foundation work, construction of bored piles and CFA piles
XXXL factory for the energy of the future




This was a large project with many challenges. Thanks to a fantastic team, we were able to manage these numerous challenges without a problem.”
Teesside and the energy revolution