Constructing an excavation pit in the beautiful town of Lindau on Lake Constance

A site with a lake view

For a commercial property in the beautiful town of Lindau on Lake Constance, Bauer Spezialtiefbau constructed the required excavation pit. But that's far from all: Overall, a geothermally activated Mixed-in-Place (MIP) wall was constructed with a total area of approx. 4,000 m² up to a depth of 22 m. No problem for our experts. The required double U king piles that geothermally activate a secant pile wall were manufactured by our partner Sülzle Nutzeisen. Bauer Resources established the connection lines for the BAUER energy wall by laying 10 km of pipes. The thermal activation was carried out afterwards. The result? Green energy for the island: a particularly sustainable and space-saving solution for supplying energy to the building. 

Facts about the project
Company :

BAUER Spezialtiefbau GmbH

Location :

Lindau on Lake Constance, Germany

Project partner :

BAUER Resources GmbH, Sülzle Nutzeisen GmbH

Period :

August 2021 to April 2022 

Services :

Excavation pits, Mixed-in-Place wall, geothermal activation

A site with a lake view: For a green future

Geothermische Aktivierung einer MIP-Wand für die Quartiersversorgung in Lindau von Bauer Spezialtiefbau
Geothermal activation of an MIP wall for neighborhood energy supply in Lindau by Bauer Spezialtiefbau
Mehr als 10 km Rohrleitungen wurden bei der Geothermie-Baustelle in Lindau von Bauer Spezialtiefbau verlegt
More than 10 km of pipes were laid by Bauer Spezialtiefbau at the geothermal heat site in Lindau
Geothermische Aktivierung einer MIP-Wand für die Quartiersversorgung in Lindau von Bauer Spezialtiefbau
Geothermal activation of an MIP wall for neighborhood energy supply in Lindau by Bauer Spezialtiefbau

Excavation pit construction in Lindau on Lake Constance

Ready for pure sustainability? Then join us on a trip to Lindau.