Soil Improvement for Double Track Kroya

On track

P.T. Bauer Pratama Indonesia has been commissioned to expand the Java railway network on two tracks. The aim is to increase the capacity of the line to cope with future transportation demand in Central Java, improve the investment climate and promote the economic development of the region. For the construction work, BG 14 drill rigs were used to drill and grout 2,903 cement columns with a diameter of 1000 mm. The column lengths varied between 9 m and 20 m and were all produced with the same mix. This is the second time that our experts on site have used the DSM (Deep Soil Mixing) method for soil improvement in a soft soil environment for a railway foundation system.

Facts about the project
Company :

P.T. BAUER Pratama Indonesia

Location :

Cilacap, Central Java, Indonesia

Project name :

Double Track Kroya

Period :

October 2016 to March 2017

Services :

Soil Improvement, Deep-Soil-Mixing

Double Track Kroya

Are you starting a new project?

Get in touch with us

P.T. BAUER Pratama Indonesia

Alamanda Tower, 19th Floor
Jl. Tb. Simatupang Kav. 23 - 24
Cilandak Barat
Jakarta Selatan 12430