Foundation work for West Damietta Simple Cycle Power Plant

Foundations for Energy

Bauer Egypt played a crucial role in the West Damietta SImple cycle Power Plant project located in Damietta. This project involved significant infrastructure development including turbine pedestals, transformer and generator transformers, and various tanks such as for solar and service water. Bauer Egypt was responsible for installing 22,000 lm of piles, with diameters of 800 and 1,000 mm and lengths of up to 36 m. This foundation work was essential for supporting the plant's main structures and additional buildings, including firefighting and control facilities.

Facts about the project
Company :

BAUER EGYPT S.A.E. Specialised Foundation Contractors

Location :

Damietta, Egypt

Project name :

West Damietta Simple Cycle Power Plant

Period :

June to September 2011

Services :

Foundation work, Bored piles

Power Piles

Are you starting a project?

Get in touch with us.

BAUER EGYPT S.A.E. Specialised Foundation Contractors

197, 26 July Street
El Mohandeseen
Cairo