Foundation work for the MRT Blue Line Project Contract 4
The MRT Blue Line Project Contract 4, Tha Phra to Lak Song Section, was developed by the Ministry of Transport and MRTA. Thai Bauer handled key foundation work. The scope of the project involved installing 44 bored piles in total, with diameters ranging from 800 to 1,800 mm, all of them reaching depths of 55 m. Additionally, 112 barrette piles of 800 x 2,700 mm and two barrette piles of 1,000 x 3,000 mm were installed. Our team completed the work in 10 months, using advanced equipment such as BG 24 and BG 28 rigs, hydraulic grabs, and heavy crawler cranes.
Thai BAUER Co. Ltd.
Bangkok, Thailand
MRT Blue Line Project Contract 4
March 2012 to March 2013
Bored Piles, Barrette Piles
Metropolitan Rapid Transit