Foundation work for the MRT Blue Line Project Contract 4

Tha Phra to Lak Song

The MRT Blue Line Project Contract 4, Tha Phra to Lak Song Section, was developed by the Ministry of Transport and MRTA. Thai Bauer handled key foundation work. The scope of the project involved installing 44 bored piles in total, with diameters ranging from 800 to 1,800 mm, all of them reaching depths of 55 m. Additionally, 112 barrette piles of 800 x 2,700 mm and two barrette piles of 1,000 x 3,000 mm were installed. Our team completed the work in 10 months, using advanced equipment such as BG 24 and BG 28 rigs, hydraulic grabs, and heavy crawler cranes.

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Bangkok, Thailand

Project name :

MRT Blue Line Project Contract 4

Period :

March 2012 to March 2013

Services :

Bored Piles, Barrette Piles

Metropolitan Rapid Transit

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand