Foundation work for MRT Blue Line Contract 3

Building underground infrastructure

Thai Bauer undertook extensive foundation work for the MRT Blue Line Contract 3 Project, encompassing a diverse range of pile installations. The project required the installation of 60 bored piles with a diameter of 1,000 mm and a depth of 55 m, 196 bored piles of 1,200 mm diameter, 128 piles of 1,500 mm diameter, and 108 piles of 1,800 mm diameter, each extending to 55 m deep. Additionally, our experts installed 16 bored piles with a diameter of 2,000 mm and 2 piles of 1,500 mm diameter in the river. The project's scope also included 160 barrette piles measuring 800 x 2,700 mm and 55 m deep. This comprehensive foundation work was essential in supporting the MRT Blue Line's infrastructure, ensuring both the stability and longevity of Bangkok's expanding rapid transit network.

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Tao Pun – Tha Phra, Bangkok, Thailand

Project name :

MRT Blue Line Contract 3

Period :

September 2011 to December 2012

Services :

Bored Piles, Barrette Piles

Metropolitan Rapid Transport

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand