Foundation work for MRT Blue Line Contract 3
Thai Bauer undertook extensive foundation work for the MRT Blue Line Contract 3 Project, encompassing a diverse range of pile installations. The project required the installation of 60 bored piles with a diameter of 1,000 mm and a depth of 55 m, 196 bored piles of 1,200 mm diameter, 128 piles of 1,500 mm diameter, and 108 piles of 1,800 mm diameter, each extending to 55 m deep. Additionally, our experts installed 16 bored piles with a diameter of 2,000 mm and 2 piles of 1,500 mm diameter in the river. The project's scope also included 160 barrette piles measuring 800 x 2,700 mm and 55 m deep. This comprehensive foundation work was essential in supporting the MRT Blue Line's infrastructure, ensuring both the stability and longevity of Bangkok's expanding rapid transit network.
Thai BAUER Co. Ltd.
Tao Pun – Tha Phra, Bangkok, Thailand
MRT Blue Line Contract 3
September 2011 to December 2012
Bored Piles, Barrette Piles
Metropolitan Rapid Transport
Are you starting a project?
Get in touch with us.
Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand