Foundation work for Motorway Route No.6 – Section 29 & 30 Project

Fast, Faster, Motorway Route No.6

For the Motorway Route No.6 –  Section 29 & 30 Project, Thai Bauer was responsible for necessary foundation work. The project involved extensive pile installation. The scope included 12 bored piles with a diameter of 1,200 mm, extending 26 m into soil and 6 m in rock, as well as 216 bored piles with a diameter of 1,500 mm, ranging from 13 to 21 m in soil and 6 to 9 m in rock. Additionally, 148 bored piles with a diameter of 1,800 mm were installed, reaching depths of 13 to 20 m in soil and 11 m in rock. Our specialists successfully completed the works in 11 months.

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Nakhon Ratchasima, Thailand

Project name :

Motorway Route No.6 – Section 29 & 30

Period :

January 2017 to January 2018

Services :

Bored Piles

Thailand's Highway Expansion

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand