Foundation work for EXAT Contract 4 Project

Buidling Bangkok's Infrastructure

For the EXAT Contract 4 Project, Thai Bauer was tasked with key foundation works. Those involved drilling and installing 67 bored piles with diameters of 1,000 mm and depths of 67 m, as well as 4 bored piles with 1,200 mm diameters at the same depth. Our experts utilized specialized equipment, including a BG 28 drilling rig and a 70-ton crawler crane, to ensure the project's solid foundation

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Bangkok, Thailand

Project name :

EXAT Contract 4 Project 

Period :

June to August 2020

Services :

Bored Piles

Expressway Authority of Thailand

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand