Foundation work for EXAT Contract 4 Project
For the EXAT Contract 4 Project, Thai Bauer was tasked with key foundation works. Those involved drilling and installing 67 bored piles with diameters of 1,000 mm and depths of 67 m, as well as 4 bored piles with 1,200 mm diameters at the same depth. Our experts utilized specialized equipment, including a BG 28 drilling rig and a 70-ton crawler crane, to ensure the project's solid foundation
Thai BAUER Co. Ltd.
Bangkok, Thailand
EXAT Contract 4 Project
June to August 2020
Bored Piles
Expressway Authority of Thailand
Are you starting a project?
Get in touch with us.
Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand