The 28 Chidlom Project in Bangkok involved extensive foundation work executed by Thai Bauer. The project included the installation of 22 barrette piles measruing 1,000 x 2,800 mm with a depth of 55 m. Additionally, 30 bored piles of 800 mm diameter, 146 bored piles of 1,000 mm diameter, and 7 bored piles of 1,200 mm diameter, all reaching a depth of 55 m, were constructed. Our expert's work also involved the installation of 2,326 m² of diaphragm walls with a thickness of 1,000 mm and a depth of 26 m. The construction was successfully completed between November 2016 and March 2017.

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Bangkok, Thailand

Project name :

28 Chidlom Project

Period :

November 2016 to March 2017

Services :

Diaphragm Wall, Bored Piles, Barrette Piles

Solid Foundations

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand