Bauer Egypt was responsible for constructing a diaphragm wall system to support the Amiria Shaft project. This included the execution of diaphragm walls with a shaft diameter of 50 m, a thickness of 1,200 mm and a depth of 60 m, totaling 8,300 m² of diaphragm walls. In addition, Bauer Egypt supplied and constructed a 10 –m thick horizontal grout blanket to control groundwater infiltration within the shaft. Excavation reached 32 m below the groundwater level, ensuring stability and structural integrity during construction.
BAUER EGYPT S.A.E. Specialised Foundation Contractors
Cairo, Egypt
Amiria Shaft
October 2008 to July 2009
Diaphragm Wall, Grout Blanket
32 m below groundwater