Diaphragm wall work for Amiria Shaft

Foundation Below Ground

Bauer Egypt was responsible for constructing a diaphragm wall system to support the Amiria Shaft project. This included the execution of diaphragm walls with a shaft diameter of 50 m, a thickness of 1,200 mm and a depth of 60 m, totaling 8,300  m² of diaphragm walls. In addition, Bauer Egypt supplied and constructed a 10 –m thick horizontal grout blanket to control groundwater infiltration within the shaft. Excavation reached 32 m below the groundwater level, ensuring stability and structural integrity during construction.

Facts about the project
Company :

BAUER EGYPT S.A.E. Specialised Foundation Contractors

Location :

Cairo, Egypt

Project name :

Amiria Shaft

Period :

October 2008 to July 2009

Services :

Diaphragm Wall, Grout Blanket

32 m below groundwater