Rosshaupten dam rehabilitation

Unique Mixed-in-Place method

The Rosshaupten Dam on Forggensee Lake in Bavaria, near the famous Neuschwanstein Castle, comprises a 40 m tall earth wall. Our experts from Bauer Spezialtiefbau executed the construction of a cut-off wall made from clay concrete for this project, including drilling and injection works, up to a depth of 85 m. One unique aspect was the installation of our Mixed-in-Place cut-off wall for stabilization. Obstacles were removed up to a depth of 48 m and the cavities were backfilled with lean concrete. The cut-off wall was constructed without expanding the dam crest, assisted by special winter equipment for work at up to -20 °C. The weather conditions posed a particular challenge here. A large project with many challenges and a successful conclusion for our team.

Facts about the project
Company :

BAUER Spezialtiefbau GmbH

Location :

Rosshaupten, Bavaria, Germany

Project name :

Rosshaupten Dam

Period :

2018 to 2019

Services :

Constructing a cut-off wall, drilling and injection work, Mixed-in-Place

Reference letter :
Publication Hydro Africa :
Publication Piling and GI :

The enormous Rosshaupten Dam

Rosshaupten dam rehabilitation

Construction of a cut-off wall made from clay concrete, including drilling and injection works, up to a depth of 85 m. One unique aspect was the installation of our Mixed-in-Place cut-off wall for stabilization.