Foundation work for Hong Kong-Zhuhai-Macao Bridge

Enormous infrastructure project

In 2009, construction began on a gigantic infrastructure project: the Hongkong-Zhuhai-Macao bridge. This 55 m long bridge shortened the travel time from Hong Kong to mainland China from four and a half hours to a mere 40 minutes. It connects the cities of Hong Kong, Macao and Zhuhai with a series of bridges, tunnels and artificial islands. For the 10 km long “Hong Kong Link Road” section, Bauer carried out the necessary piling works. What makes this project unique: The work involved installing a total of 230 offshore piles with lengths of up to 115 m, a maximum diameter of 2.5 m and up to 5 m of rock socketing. This megaproject was a major challenge, but not a problem for the experts from Bauer.

Facts about the project
Company :

BAUER Hong Kong Ltd.

Location :

Hongkong 

Project name :

Hongkong-Zhuhai-Macao-Bridge

Period :

April 2013 to December 2014

Services :

Foundation work, construction of offshore piles

Enormous images of the major bridge in Hong Kong

 Bauer Spezialtiefbau constructs a total of 230 offshore piles for major bridge in Hong Kong
Bauer Spezialtiefbau constructs a total of 230 offshore piles for major bridge in Hong Kong
Bauer Spezialtiefbau führt alle Pfahlbohrungen für Megabrücke von Stahlplattformen aus
Bauer Spezialtiefbau carries out all pile borings for major bridge from steel platforms
Gründungsarbeiten für die Megabrücke Hongkong-Zhuhai-Macao-Bridge von Bauer Spezialtiefbau
Bauer Spezialtiefbau carries out foundation work for the major Hongkong-Zhuhai-Macao Bridge

Major bridge in Hong Kong

In order to display the video on the US platform YouTube, we need your consent to the associated data processing, as described in our data protection declaration. Agree and view external content

The enormous Hong Kong-Zhuhai-Macao Bridge infrastructure project. Dive right into this major project now.

Are you starting a project?

Then get in touch with us.

BAUER Spezialtiefbau GmbH
Head office