Dam work for Jannah Dam in Lebanon

Vital reservoir

The Jannah Dam is not only an impressive arch-gravity dam, but also a vital reservoir with 38 million m³ of water to supply Byblos, Beirut and the surrounding area. Bauer Spezialtiefbau achieved amazing results here: With a total of 9,500 m² of clay concrete cut-off walls reaching up to a depth of 50 m, and parallel diaphragm walls that are connected together by an arch-shaped bulkhead, they ensure not only vertical underground sealing but also stability up to a depth of 36 m. In addition, injection curtains are installed along the dam foundation and inserted in the abutments to minimize seepage water, while special rails with mobile platforms on steep slopes enable the valuable construction of the sealing curtain before the actual RCC dam construction.

Facts about the project
Company :

BAUER Lebanon Foundation Specialist S.a.r.l.

Location :

Byblos Mount District, Lebanon

Project name :

Jannah Dam

Period :

August 2017 to January 2020

Services :

Diaphragm walls on upstream and downstream cofferdam, drilling and injection work

Reference Letter Phase II (1) :
Reference Letter Phase II (2) :
Publication :

The impressive Jannah Dam in Lebanon

Drilling and injection work for Jannah Dam

In order to display the video on the US platform YouTube, we need your consent to the associated data processing, as described in our data protection declaration. Agree and view external content

The Jannah Dam is a vital reservoir with 38 million m³ of water to supply Byblos, Beirut and the surrounding area.

Are you starting a project?

Get in touch with us

BAUER Spezialtiefbau GmbH
Head office