Dam rehabilitation work on the Eagle Mountain Dam
The Eagle Mountain Dam and Lake, northwest of Fort Worth, Texas, is 25 m tall and 1,463 m long. The owner Tarrant Regional Water District (TRWD) tasked the experts from Bauer Spezialtiefbau with the planned dam rehabilitation work. To ensure ongoing flood protection and water supply, an 80 m long sandstone cut-off wall was constructed up to a depth of 18 m. BAUER Foundation Corp. executed the cut-off wall using the Cutter Soil Mixing (CSM) method to reduce the amount of seepage water. The CSM panels were constructed in a specific sequence to minimize the porosity of the soil. The scope of service also included verification drilling and injection work.
BAUER Foundation Corp.
Texas, USA
Eagle Mountain Dam
April 2022 to June 2022
Cutter Soil Mixing, drilling and injection work