Cut-off wall work on the Teesta River in India

Electricity from hydropower

Generating power with renewable resources while at the same time protecting residents against floods was the clear focus of the Teesta VI Hydroelectric Project in India. The services of our Bauer team include construction of an anchored secant pile wall, consisting of around 10,000 linear meters of piles with a diameter of 800 mm, as well as around 60,000 linear meters of anchors. The secant pile wall will make a 40 m deep excavation possible for the intake structure on the right bank. Furthermore, in two individual stages along the upstream cofferdam, a 4.700 m² cut-off wall will be constructed using the jet grouting technique, as well as 4,600 m² of diaphragm wall on the upstream side of the barrage. A large project with many challenges.

Facts about the project
Company :

BAUER Engineering India Private Limited

Location :

Singtam, Sikkim, India

Project name :

Teesta VI Hydro Electric-Projekt

Period :

April 2021 to Fall 2024

Services :

Secant pile wall, anchor work, cut-off wall using jet grouting technique

Press release :

Teesta VI Hydroelectric Hydropower Plant in India

Construction of the Teesta VI hydropower plant in India by Bauer Spezialtiefbau
Construction of the Teesta VI hydropower plant in India by Bauer Spezialtiefbau
Bauer Spezialtiefbau constructs 10,000 linear meters of piles with a diameter of 800 mm, as well as around 60,000 linear meters of anchors for the hydropower plant in India
Bauer Spezialtiefbau constructs 10,000 linear meters of piles with a diameter of 800 mm, as well as around 60,000 linear meters of anchors for the hydropower plant in India
Strom aus Wasserkraft beim Teesta VI Hydro Electric Projekt in Indien von Bauer Spezialtiefbau
Strom aus Wasserkraft beim Teesta VI Hydro Electric Projekt in Indien von Bauer Spezialtiefbau

Are you starting a project? 

Then get in touch with us.

BAUER Spezialtiefbau GmbH
Head office