Cut-off wall work in East St. Louis

Dike rehabilitation on the banks of the Mississippi

In the U.S. state of Illinois, an existing levee system was upgraded on the east bank of the Mississippi. Due to the sandy subsoil, which allowed water to seep in and caused erosion, extensive rehabilitation and restoration of the existing dike was necessary. Using a combination of gripping and cutting technology and by adding a self-hardening slurry, our team constructed around 53,000 m² of single-phase cut-off wall over a length of 1.4 km. What makes this project unique: the cut-off wall elements were installed up to a maximum depth of 43.5 m. An outstanding feat on the banks of the Mississippi.

Facts about the project
Company :

BAUER Foundation Corp.

Location :

East St. Louis, Illinois

Project name :

Dike rehabilitation East St. Louis

Period :

March 2020 to January 2022

Services :

Single-phase cut-off wall

Cut-off wall work on the banks of the Mississippi

Bauer Spezialtiefbau carries out extensive rehabilitation work on the banks of the Mississippi
Bauer Spezialtiefbau carries out extensive rehabilitation work on the banks of the Mississippi
Bauer Spezialtiefbau rehabilitates dike on the banks of the Mississippi in East St. Louis
Bauer Spezialtiefbau rehabilitates dike on the banks of the Mississippi in East St. Louis
Dike rehabilitation on the banks of the Mississippi by Bauer Spezialtiefbau
Dike rehabilitation on the banks of the Mississippi by Bauer Spezialtiefbau

Are you starting a project?

Then get in touch with us.

BAUER Spezialtiefbau GmbH
Head office