Foundation work for Woodsmith Mine

Deepest mine of the UK

Our team of Bauer Technologies was appointed by Sirius Minerals Plc to install three up to 120 m deep diaphragm wall shafts, with diameters between 8 m and 35 m, as part of the works to construct the UK’s deepest mine, which over a period of five years will see Sirius Minerals extract large quantities of Polyhalite for global distribution. The ground conditions at Woodsmith Mine were challenging and the intermittent nature of the geological lamination made the cuttings process technically challenging, which required the team of Bauer Technologies to deploy a number of cutter wheel configurations to optimize performance. In addition, the wheels were equipped with three types of bespoke teeth, in nine variations of size, position and strength. As part of our scope of works large quantities of bentonite slurry had to be reconditioned in a complex de-sanding plant, by use of specially designed polymer-based additives. We commenced works on the first panel at the beginning of December 2017 and completed its scope of the project, to the agreed programme, in December 2018.

Facts about the project
Company :

BAUER Technologies Limited

Location :

York Potash

Project name :

Woodsmith Mine

Period :

October 2017 to December 2018

Services :

Diaphragm Wall shaft, Service shaft headgear chamber, Production shaft headgear chamber

Publication :

Foundation work for Woodsmith Mine in York Potash

Do you have any questions?

To discuss your project geotechnical requirements, please contact our team. 

BAUER Technologies Ltd.

10 Ducketts Wharf
South Street
Bishops Stortford
Hertfordshire
CM23 3AR United Kingdom