Foundation work for LNG Receiving Terminal Expansion Project

Phase II

For the LNG Receiving Terminal Expansion Project – Phase II in Rayong, Thai Bauer played a crucial role in executing foundational works. Our experts installed 12 pilot bored piles and anchor piles, each with a diameter of 1,200 mm and a depth of 20 m. Furthermore, the scope of the project included the construction of 616 working bored piles of the same dimensions, ensuring structural integrity for the expansion. Equipped with advaned machinery,   including multiple BG rigs and crawler cranes, our team successfully completed the project in four months. This expansion enhances the terminal's capacity to meet growing Liquefied Natural Gas demands in the region.

Facts about the project
Company :

Thai BAUER Co. Ltd.

Location :

Rayong, Thailand

Project name :

LNG Receiving Terminal Expansion Project – Phase II

Period :

May to October 2014

Services :

Bored Piles

Liquefied Natural Gas

Are you starting a project?

Get in touch with us.

Thai BAUER Co. Ltd.

Two Pacific Place, 17th Floor
142 Sukhumvit Road
Bangkok 10110
Thailand