Excavation pit construction for Ismailia Tunnels under Suez Canal
Bauer Egypt was commissioned to carry out essential geotechnical works for the construction of twin car tunnels supplementing the new Suez Canal in Ismailia. This ambitious project involves crossing both the old and the new Suez Canal with a total tunnel length of approximately 5,975 m. Bauer Egypt’s role focused on the TBM entry and exit zones, as well as the construction of four deep ventilation shafts along the tunnel passage. The scope of work included constructing 50,218 m² of diaphragm walls, with thicknesses ranging from 1,000 mm to 1,500 mm, and depths up to 50 m. Additionally, a 21,250 m² soft gel grout plug was installed at a 50 mdepth to stabilize the structure. Our experts successfully completed the project and ensured future stability and safety.
BAUER EGYPT S.A.E. Specialised Foundation Contractors
Ismailia, Egypt
Ismailia Tunnels under Suez Canal
June 2015 to January 2018
Ventilation shafts, Diaphragm Walls
Underneath the Suez Canal
Are you starting a project?
Get in touch with us.
197, 26 July Street
El Mohandeseen
Cairo